Approval for Rail

The inspection body of DB Systemtechnik confirms with the inspection certificate the conformity of our NDT testing facility with the requirements of DIN 27201‑7 for the industry sector railway maintenance. Basis is the inspection from 17.02.2022 and the inspection report 68039‑003‑IGZfP‑IB‑9010 dated 07.06.2022 (registration number DB‑52‑AB‑319‑1‑22).
Component | NDT Method |
---|---|
Axle shaft with longitudinal bore | UT · MT · VT |
Axle shaft without longitudinal bore | UT · MT · VT |
Wheel / wheel disc | UT · MT · VT |
Bogie frame | UT · MT · VT · PT |
Vehicle frame | UT · MT · VT · PT · RT |
Draw hooks, tension rods, parts of central buffer couplings | UT · MT · VT · RT |
Buffers, buffer assemblies | UT · MT · VT |
Other components | UT · MT · VT · PT · RT |
Note: The certificate refers to the objects and conditions specified in the inspection report. Entry in the DGZfP register: valid from 01.03.2022 to 28.02.2027.